Buy. Sell. Rent. Lease. Collaborate. Joint Venture. Invest. Rental
Properties for Sale.
Details Of U/C Booked During Period 01.01.2005 To 31.07.2005 In Civil Lines Zone
This list has been taken from the site of MCD and presented in a easy manner. We take no responsibility of the data. Please do check with www.mcdonline.gov.in for verification and updates. We shall try to keep up with the MCD site. We think MCD has done a great job to bring relief to many investors by bringing this transparency. Kudos to MCD.
U/C in the Shape of 1 Room, 1 Toilet, Mumty on Terrace and Chhajja on MPL Land at IIIrd Floor
26/04/2005
155.
155, 05/04/05
O/B
A-44, Kamla Nagar
U/C in the Shape of Iron Shutter Fixed at GF, 4 Nos. Small and 8 Nos. Big Shutter
27/04/2005
156.
156, 05/04/05
O/B
A-83, Kamla Nagar
U/C in the Shape of 2 Rooms, 2 Bathrooms, Stair Case, Chhajja on MPL Land at IIIrd Floor and fixed of 3 Nos. Big Iron Shutters at GF
27/04/2005
157.
157, 05/04/05
O/B
A-87, Kamla Nagar
U/C in the Shape of 7 Rooms, 2 Kitchens, 4 L/B Lobby, Stair Case, Mumty Chhajja on MPL Land at IIIrd Floor and Fixing of 9 Nos. Iron Shutters at GF
27/04/2005
158.
158, 05/04/05
Sh. Ram Swaroop
D-166, Kamla Nagar
U/C in the Shape of 6 Rooms, 1 D/D 4 Nos. L/B Lobby, 2 Kitchen, Stair Case, Chhajja at MPL Land Mumty at IIIrd Floor and 9 Nos. Shutters fixed at GF
27/04/2005
159.
159, 05/04/05
O/B
458, Bhai Parmanand Colony
U/C in the Shape of Excess Coverage at GF and Ist Floor in Front and Rear Set Back and Projection on MCD
26/04/2005
160.
160, 05/04/05
O/B
44, Bhai Parmanand Colony
U/C in the Shape of Excess Coverage at GF and Ist Floor in Front and Rear Set Back and Projection on MPL Land and same other deviation
07/04/2005
161.
161, 05/04/05
Sh. Ajay Setiya
3, Radio Colony
U/C in the Shape of 8 Rooms, 2 Lobbies, 4 Toilets, 2 Kitchens with Stairs at Ist Floor
26/04/2005
162.
162, 05/04/05
O/B
2381, Hudson Line
U/C in the Shape of Excess Coverage in Front and Rear Set Back and Projection on MPL Land at GF and Ist Floor and ongoing at IInd Floor
26/04/2005
163.
163, 05/04/05
O/B
990, Mukherjee Nagar
U/C in the Shape of Excess Coverage in Front and Rear Set Back in Hal Portion at IInd Floor and IIIrd Floor (ongoing)
26/04/2005
164.
164, 05/04/05
O/B
993, Mukherjee Nagar
U/C in the Shape of Excess Coverage in Front and Rear Set Back and Projection on MPL Land at GF, Ist Floor, IInd Floor in Halfly Portion of the Property
26/04/2005
165.
165, 05/04/05
Sh. Bhagwan Singh
1236, Mukherjee Nagar
U/C in the Shape of Excess Coverage at GF and Ist Floor in Front and Rear Set Back Projection on MPL Land same other deviation ongoing at IInd Floor
26/04/2005
166.
166, 07/04/05
O/B
1223, Mukherjee Nagar
U/C in the Shape of Excess Coverage at IInd Floor and IIIrd Floor (entire) in Front and Rear Set Back with Old Structure Projection on MPL Land on all Floors in Half Portion
28/04/2005
167.
167, 07/04/05
Sh. S.P. Singh
91, West Mukherjee Nagar
U/C in the Shape of Extention of Front and Rear with Old Construction IInd Floor Excess Coverage in Front and Rear entire Construction going on at IIIrd Floor with Projection on MPL Land on all Floors
28/04/2005
168.
168, 07/04/05
Smt. Wanti Devi
204, Indra Vihar
Deviation against SBP No. 162/B/clz/04 of 27/12/04 at GF and Ist Floor
28/04/2005
169.
169, 07/04/05
O/B
134, West Mukherjee Nagar
U/C in the Shape of Excess Coverage in Front and Rear Set Back at GF, Ist Floor and IInd Floor (ongoing)
28/04/2005
170.
170, 07/04/05
O/B
1947, Outram Line
U/C in the Shape of Excess Coverage with Old Construction in Front and Rear at GF and Ist Floor Excess Coverage at IInd Floor in Front and Rear Entire Construction on IIIrd Floor, the all Construction in Half Portion of the Property
28/04/2005
171.
171, 07/04/05
Sh. S.S. Setia
1788, Outram Line
U/C in the Shape of Exclusion in Front and Rear Set Back and Some other Deviation at GF and Ist Floor and IInd Floor
28/04/2005
172.
172, 07/04/05
O/B
2389, Hudson Line
Excess Coverage in Front and Rear Set Back at GF and Ist Floor with Old Construction, Excess Coverage at IInd Floor in Front Set Back and Rear Set Back, Entire Construction at IIIrd Floor in Ongoing Stage
28/04/2005
173.
173, 12/04/05
O/B
2/30, Roop Nagar
U/C in the Shape of 3 Rooms, Kitchen, Store, 3 Nos. L/B Lobby, Stair Case, Mumty Chhajja on MPL Land at IIIrd Floor and Mumty
27/04/2005
174.
174, 12/04/05
Sh. Sanjeev Gupta
2/85, Roop Nagar
U/C in the Shape of 8 Rooms, 2 Kitchen, 4 L/B Lobby, Chhajja at MPL Land Stair Case at IIIrd Floor, Mumty at Terrace
27/04/2005
175.
175, 12/04/05
Sh. Pramod Kumar
10251, Mill Wali Gali, Nawab Ganj
U/C in the Shape of 2 Rooms, Gallery, Stairs, Toilet, Projection on MPL Land
04/05/2005
176.
176, 12/04/05
O/B
Pusta Ganda Nala, Burari
U/C of 1 Room at GF
04/05/2005
177.
177, 12/04/05
O/B
Along Hingiri, Village Burari
U/C of Walls for Room at GF
04/05/2005
178.
178, 19/04/05
Smt. Raj Kumari
B-3/13, R.P. Bagh
U/C in the Shape of Deviation against SBP No. 142/B/clz/04 of 04/11/04 at GF, Ist Floor and IInd Floor and U/C in the Shape of 5 Rooms, Kitchen, Bath, Lobby and Stair Case at IIIrd Floor
07/05/2005
179.
179, 19/04/05
Sh. Joginder Nath Anand
B-3/14, R.P. Bagh
U/C in the Shape of Deviation against SBP No. 143/B/clz/04 of 04/11/04 at GF, Ist Floor and IInd Floor
07/05/2005
180.
180, 19/04/05
Smt. Sarala
3/7, Model Town
U/C in the Shape of 4 Rooms, 1 Lobby at Ist Floor
07/05/2005
Top Life is a bank account - put nothing in it and you get nothing out.
Our Brokerage: Rent: Equivalent to one month's rent : Sale: Equal to 2% of
the deal value. Service tax extra (10.2%) Short term let: 15% of the gross.
TDS on brokerage - 5.61% TDS on rent - 16.83%
Lease, sale, franchise, collaborations etc. Residential, Office, Industry,
Retail, School etc. Delhi, Gurgaon, Noida, Faridabad, Ghaziabad.
Email:
swagatamwebsite@gmail.comDisclaimer