|
|
List of Unauthorised Constructions in Delhi - MCD,South Zone
|
This list has been taken from the site of MCD and presented in a easy manner. We take no responsibility of the data. Please do check with www.mcdonline.gov.in for verification and updates. We shall try to keep up with the MCD site. We think MCD has done a great job to bring relief to many investors by bringing this transparency. Kudos to MCD.
page
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
|
S.No. File No. with date Property No & Address Extent of unauthorized construction Remarks
|
|
18
1.
70/B/UC/SZ/03
09.04.03
M-61, G.K.-I (Mkt.) U/c by covering the RSB at GF by providing ACC shed at GF and covering at FF & SF.
|
18
2.
71/B/UC/SZ/03
09.04.03
M-62, G.K.-I (Mkt.) U/c by covering the RSB at BM and sheet of ACC at GF and covering at SF.
|
18
3.
72/B/UC/SZ/03
09.04.03
M-63, G.K.-I (Mkt.) U/c by covering the RSB at BM,GF,FF,SF
|
18
4.
73/B/UC/SZ/03
09.04.03
M-64, G.K.-I (Mkt.) U/c by covering the RSB at GF,FF,SF (2 shops)
|
18
5.
74/B/UC/SZ/03
09.04.03
M-65, G.K.-I (Mkt.) U/c by covering the RSB at GF and SF
|
18
6.
75/B/UC/SZ/03
09.04.03
M-66, G.K.-I (Mkt.) U/c by covering the RSB at BM,GF,FF,SF.
|
18
7.
76/B/UC/SZ/03
09.04.03
M-67, G.K.-I (Mkt.) U/c by covering the RSB at GF
|
18
8.
77/B/UC/SZ/03
09.04.03
M-68, G.K.-I (Mkt.) U/c by covering the RSB at BM,GF,FF,SF and u/c at TF.
|
18
9.
78/B/UC/SZ/03
09.04.03
M-69, G.K.-I (Mkt.) U/c by covering the RSB at BM,GF,FF,SF (4 shops at GF)
|
19
0.
79/B/UC/SZ/03
09.04.03
M-70, G.K.-I (Mkt.) U/c by covering the RSB at BM,GF,FF,SF.
|
19
1.
80/B/UC/SZ/03
09.04.03
M-71, G.K.-I (Mkt.) U/c by covering the RSB at GF,FF,SF (3 shops)
|
19
2.
81/B/UC/SZ/03
09.04.03
M-72, G.K.-I (Mkt.) U/c by covering the RSB at GF,FF,SF (3 shops)
|
19
3.
82/B/UC/SZ/03
09.04.03
M-73, G.K.-I (Mkt.) U/c by covering the RSB at BM and also ACC shed at GF.
|
19
4.
83/B/UC/SZ/03
09.04.03
S-91, Panchsheel Park Deviation/excess coverage against the SBP 178/B/SZ/02 dt. 23.10.02 at BM & GF
and infringement in set back.
|
19
5.
84/B/UC/SZ/03
09.04.03
N-14, Malviya Nagar In continuation of u/c file No. 268/B/UC/SZ/03 u/c of conversion of residential unit
into commercial by constructing three shops at GF.
|
19
6.
85/B/UC/SZ/03
09.04.03
80/55B, Malviya Nagar In continuation of u/c file No.4/B/UC/SZ/02 dt. 03.01.02 u/c of three rooms, one
toilet, one kitchen and one store at TF.
|
19
7.
86/B/UC/SZ/03
16.04.03
29-B, DDA Janta Flats,
Vasant Enclave
U/c at FF and SF.
|
19
8.
87/B/UC/SZ/03
17.04.03
136-B, Gautam Nagar U/c on BM , GF, FF, SF and TF without SBP.
|
19
9.
88/B/UC/SZ/03
17.04.03
S-412, G.K.-I U/c at SF in shape of three rooms over existing very old GF & FF.
|
20
0.
89/B/UC/SZ/03
02.05.03
116, Prajapat Mohalla, Basant
Village
U/c of one room.
|
20
1.
90/B/UC/SZ/03
02.05.03
33-B, DDA Flats, Ber Sarai U/c of one room and bathroom at FF.
|
20
2.
91/B/UC/SZ/03
02.05.03
29-A, DDA Flats, Katwaria Sarai U/c by way of extension of room in RSB at GF.
|
20
3.
92/B/UC/SZ/03
02.05.03
30-A, DDA Flats, Katwaria Sarai U/c by providing/fixing wooden window in front balcony at FF.
|
20
4.
93/B/UC/SZ/03
02.05.03
K-47, Kailash Colony Deviation/excess coverage from SBP No.193/B/SZ/02 dt. 13.11.02 at BM,GF,FF & SF.
|
20
5.
94/B/UC/SZ/03
02.05.03
E-4, G.K.-I Deviation/excess coverage from SBP at BM,GF,FF,SF and infringement in RSB.
|
20
6.
95/B/UC/SZ/03
02.05.03
E-71, G.K.-I Deviation/excess coverage from SBP and infringement in RSB at BM,GF,FF,SF.
|
20
7.
96/B/UC/SZ/03
02.05.03
C-38, G.K.-I U/c by covering the front set back by laying the RCC roof and entry to BM front side.
|
20
8.
97/B/UC/SZ/03
06.05.03
11-A, DDA Janta Flats, Vasant Encl. U/c in the shape of covering of open courtyard.
|
20
9.
98/B/UC/SZ/03
06.05.03
12-A, DDA Janta Flat, Vasant
Enclave
U/c in the shape of covering of open courtyard.
|
21
0.
99/B/UC/SZ/03
06.05.03
19-B, DDA Janta Flats, Vasant
Enclave.
U/c at FF,SF & TF.
|